The commissioning phase of the Virgo gravity-wave interferometric detector started in September 2003, and is still progressing towards the objective to achieve a stable operation of the detector, at its design strain sensitivity.
In October 2004 the interferometer was locked for the rst time in the recycled conguration, with the laser power reduced by a factor of 10. In April 2006, after some important modications of the input optics, the commissioning was able to continue with the full beam power restored. This new phase was also characterized by a strong boost to the noise hunting activity. From September 2006, at the time of this conference, monthly science run were planned to test the detector performance and reliability, and to prepare the transition to the long scientic data taking period which is foreseen for 2007 in coincidence with LIGO.
In this article the main features of Virgo, together with its actual status and the plans for its future upgrade, are presented.
The Status of Virgo / Acernese, F; Amico, P; Alshourbagy, M; Antonucci, F; Aoudia, S; Avino, Saverio; Babusci, D; Ballardin, G; Barone, F; Barsotti, L; Barsuglia, M; Beauville, F; Bigotta, S; Birindelli, S; Bizouard, M. A.; Boccara, C; Bondu, F; Bosi, L; Bradaschia, C; Braccini, S; Brillet, A; Brisson, V; Brocco, L; Buskulic, D; Calloni, Enrico; Campagna, E; Cavalier, F; Cavalieri, R; Cella, G; Cesarini, E; CHASSANDE MOTTIN, E; Christensen, N; Corda, C; Cottone, F; Clapson, A. C.; Cleva, F; Coulon, J. P.; Cuoco, E; Dari, A; Dattilo, V; Davier, M; DEL PRETE, M; DE ROSA, Rosario; DI FIORE, L; DI VIRGILIO, A; Dujardin, B; Eleuteri, Antonio; Enard, D; Ferrante, I; Fidecaro, F; Fiori, I; Flaminio, R; Fournier, J. D.; Francois, O; Frasca, S; Frasconi, F; Freise, A; Gammaitoni, L; Garufi, Fabio; Gennai, A; Giazotto, A; Giordano, G; Giordano, Lara; Gouaty, R; Grosjean, D; Guidi, G; Hebri, S; Heitmann, H; Hello, P; Karkar, S; Kreckelbergh, S; LA PENNA, P; Laval, M; Leroy, N; Letendre, N; Lorenzini, M; Loriette, V; Loupias, M; Losurdo, G; Majorana, E; Man, C. N.; Mantovani, M; Marchesoni, F; Marco, T; Marion, F; Marque, J; Martelli, F; Masserot, A; Mazzoni, M; Milano, Leopoldo; Moins, C; Moreau, J; Morgado, N; Mours, B; Nocera, F; Pai, A; Palomba, C; Paoletti, F; Pardi, Silvio; Pasqualetti, A; Passaquieti, R; Passuello, D; Perniola, B; Piergiovanni, F; Pinard, L; Poggiani, R; Punturo, M; Puppo, P; Qipiani, K; Rapagnani, P; Reita, V; Remillieux, A; Ricci, F; Ricciardi, I; Ruggi, P; Russo, Guido; Solimeno, Salvatore; Spallicci, A; Stanga, R; Tonelli, M; Toncelli, A; Tournefier, E; Travasso, F; Tremola, C; Vajente, G; Verkindt, D; Vetrano, F; Vicere', A; Vinet, J. Y.; Vocca, H; Yvert, M.. - ELETTRONICO. - (2007), pp. 1-12. (Intervento presentato al convegno XVII SIGRAV Congress on General Relativity and Gravitational Physics tenutosi a Torino, Italy nel 4-6 Settembre 2006).
The commissioning phase of the Virgo gravity-wave interferometric detector started in September 2003, and is still progressing towards the objective to achieve a stable operation of the detector, at its design strain sensitivity.
In October 2004 the interferometer was locked for the rst time in the recycled conguration, with the laser power reduced by a factor of 10. In April 2006, after some important modications of the input optics, the commissioning was able to continue with the full beam power restored. This new phase was also characterized by a strong boost to the noise hunting activity. From September 2006, at the time of this conference, monthly science run were planned to test the detector performance and reliability, and to prepare the transition to the long scientic data taking period which is foreseen for 2007 in coincidence with LIGO.
In this article the main features of Virgo, together with its actual status and the plans for its future upgrade, are presented.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11588/118774
Citazioni
ND
61
ND
social impact
Conferma cancellazione
Sei sicuro che questo prodotto debba essere cancellato?
simulazione ASN
Il report seguente simula gli indicatori relativi alla propria produzione scientifica in relazione alle soglie ASN 2023-2025 del proprio SC/SSD. Si ricorda che il superamento dei valori soglia (almeno 2 su 3) è requisito necessario ma non sufficiente al conseguimento dell'abilitazione. La simulazione si basa sui dati IRIS e sugli indicatori bibliometrici alla data indicata e non tiene conto di eventuali periodi di congedo obbligatorio, che in sede di domanda ASN danno diritto a incrementi percentuali dei valori. La simulazione può differire dall'esito di un’eventuale domanda ASN sia per errori di catalogazione e/o dati mancanti in IRIS, sia per la variabilità dei dati bibliometrici nel tempo. Si consideri che Anvur calcola i valori degli indicatori all'ultima data utile per la presentazione delle domande.
La presente simulazione è stata realizzata sulla base delle specifiche raccolte sul tavolo ER del Focus Group IRIS coordinato dall’Università di Modena e Reggio Emilia e delle regole riportate nel DM 589/2018 e allegata Tabella A. Cineca, l’Università di Modena e Reggio Emilia e il Focus Group IRIS non si assumono alcuna responsabilità in merito all’uso che il diretto interessato o terzi faranno della simulazione. Si specifica inoltre che la simulazione contiene calcoli effettuati con dati e algoritmi di pubblico dominio e deve quindi essere considerata come un mero ausilio al calcolo svolgibile manualmente o con strumenti equivalenti.