The paper outlines a methodology for the preliminary assessment of construction and demolition (C&D) waste. In particular, the work focuses on the possibility of implementing selective demolition procedures, aimed at the punctual “deconstruction” of the building in order to streamline the materials and components reclamation operations, maximizing their reusability and/or recyclability potential. In this sense, the aim of the study is the elaboration of a BIM-based protocol for the pre-determination of material flows from demolition, through the standardization of the C&D waste production process. The protocol is in line with the Italian legislation and designed in the framework of the selective demolition site in compliance with the guiding criteria of the European legislation. The information derived from the application of the methodology fuels the knowledge system needed to frame the labelling of C&D products towards their possible reuse or recycling. Starting from the analysis of a case study, identified in the former Corradini industrial complex, located in the eastern area of Naples, the research experimentally developed the methodological articulation of the protocol, aiming at the quantification and management of waste flows, their pre-characterization according to the CER code, and the planning of material flows towards reuse, recycling or landfill chains. The research is the result of the PROSIT project - “Designing in Sustainability”, carried out by the Department of Architecture and the Department of Structures for Engineering and Architecture of the University of Naples “Federico II” with the public-private consortium STRESS scarl and in collaboration with the Municipality of Naples.

Valutazione BIM-based ex ante dei rifiuti da C&D per la demolizione selettiva / Rigillo, M.; Galluccio, G.; Paragliola, F.; Piccirillo, S.; Tordo, S.. - (2023), pp. 352-365. (Intervento presentato al convegno V Convegno Internazionale Recycling. Il valore della materia nella transizione ecologica del settore delle costruzioni tenutosi a Roma nel 26 maggio 2023).

Valutazione BIM-based ex ante dei rifiuti da C&D per la demolizione selettiva

M. Rigillo
Primo
Methodology
;
G. Galluccio
Membro del Collaboration Group
;
F. Paragliola
Membro del Collaboration Group
;
S. Piccirillo
Data Curation
;
S. Tordo
Data Curation
2023

Abstract

The paper outlines a methodology for the preliminary assessment of construction and demolition (C&D) waste. In particular, the work focuses on the possibility of implementing selective demolition procedures, aimed at the punctual “deconstruction” of the building in order to streamline the materials and components reclamation operations, maximizing their reusability and/or recyclability potential. In this sense, the aim of the study is the elaboration of a BIM-based protocol for the pre-determination of material flows from demolition, through the standardization of the C&D waste production process. The protocol is in line with the Italian legislation and designed in the framework of the selective demolition site in compliance with the guiding criteria of the European legislation. The information derived from the application of the methodology fuels the knowledge system needed to frame the labelling of C&D products towards their possible reuse or recycling. Starting from the analysis of a case study, identified in the former Corradini industrial complex, located in the eastern area of Naples, the research experimentally developed the methodological articulation of the protocol, aiming at the quantification and management of waste flows, their pre-characterization according to the CER code, and the planning of material flows towards reuse, recycling or landfill chains. The research is the result of the PROSIT project - “Designing in Sustainability”, carried out by the Department of Architecture and the Department of Structures for Engineering and Architecture of the University of Naples “Federico II” with the public-private consortium STRESS scarl and in collaboration with the Municipality of Naples.
2023
9791259530462
Valutazione BIM-based ex ante dei rifiuti da C&D per la demolizione selettiva / Rigillo, M.; Galluccio, G.; Paragliola, F.; Piccirillo, S.; Tordo, S.. - (2023), pp. 352-365. (Intervento presentato al convegno V Convegno Internazionale Recycling. Il valore della materia nella transizione ecologica del settore delle costruzioni tenutosi a Roma nel 26 maggio 2023).
File in questo prodotto:
File Dimensione Formato  
Rigillo Galluccio Paragliola Piccirillo Tordo (1).pdf

solo utenti autorizzati

Tipologia: Documento in Post-print
Licenza: Accesso privato/ristretto
Dimensione 3.72 MB
Formato Adobe PDF
3.72 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11588/930823
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact