The Campania Regional Metro System (RMS) project is an example of integrated land-use, infrastructure and operational planning. The whole project is based on the idea of integrating the existing railway lines into a single physical network by building some new links, new stations and new modal interchange facilities. The RMS project integrates also operational components such as service lines, timetables and integrated pricing. In addition to the transit ‘‘supply-side’’ elements, the project includes relevant ‘‘demand-side’’ aspects, including town planning based on the rail network, urban renewal around rail stations and upgraded and new stations with high architectural standards and a new symbolic value. This paper describes the general structure of the project. It also discusses some preliminary results on land-use and modal shift after the implementation of the first stage of the project, which included 43km of new railways lines, 30 new stations, an integrated timetable and a single integrated ticket.

Integrated railways-based policies: The Regional Metro System (RMS) project of Naples and Campania / Cascetta, Ennio; Pagliara, Francesca. - In: TRANSPORT POLICY. - ISSN 0967-070X. - ELETTRONICO. - 15:2(2008), pp. 81-93. [10.1016/j.tranpol.2007.11.001]

Integrated railways-based policies: The Regional Metro System (RMS) project of Naples and Campania

CASCETTA, ENNIO;PAGLIARA, FRANCESCA
2008

Abstract

The Campania Regional Metro System (RMS) project is an example of integrated land-use, infrastructure and operational planning. The whole project is based on the idea of integrating the existing railway lines into a single physical network by building some new links, new stations and new modal interchange facilities. The RMS project integrates also operational components such as service lines, timetables and integrated pricing. In addition to the transit ‘‘supply-side’’ elements, the project includes relevant ‘‘demand-side’’ aspects, including town planning based on the rail network, urban renewal around rail stations and upgraded and new stations with high architectural standards and a new symbolic value. This paper describes the general structure of the project. It also discusses some preliminary results on land-use and modal shift after the implementation of the first stage of the project, which included 43km of new railways lines, 30 new stations, an integrated timetable and a single integrated ticket.
2008
Integrated railways-based policies: The Regional Metro System (RMS) project of Naples and Campania / Cascetta, Ennio; Pagliara, Francesca. - In: TRANSPORT POLICY. - ISSN 0967-070X. - ELETTRONICO. - 15:2(2008), pp. 81-93. [10.1016/j.tranpol.2007.11.001]
File in questo prodotto:
File Dimensione Formato  
TRANSPORTPOLICY(2008).pdf

non disponibili

Tipologia: Documento in Post-print
Licenza: Accesso privato/ristretto
Dimensione 1.16 MB
Formato Adobe PDF
1.16 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11588/413791
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 50
  • ???jsp.display-item.citation.isi??? 35
social impact